建設記録

Construction record
PointA PointB PointC PointD PointE PointF PointG
25May2015

C 複合発電設備(東側)Gas turbine unit(east side)

2015/5/25 タービン建屋屋上機器コンパートメントやダクト類(手前)、ガス精製排水処理建屋外壁(中左)は塗装工事に入っています。 May 25, 2015: As for the Turbine building, the rooftop equipment compartment, ducts (front) and Wastewater treatment facility building, the exterior walls (left center) are currently being painted.
前へ
PAGE TOP