建設記録

Construction record
PointA PointB PointC PointD PointE PointF PointG
25Mar2015

C 複合発電設備(東側)Gas turbine unit(east side)

2015/3/25 各設備では引き続き補機・配管・ケーブル等の設置を進めています。排水処理設備エリア(中左)では、ガス精製排水処理設備建屋の鉄骨が組み上がりました。 March 25, 2015 The installation of auxiliary parts, pipes, and cables is continuing at individual facilities. The framework of the wastewater treatment facility building for refining gas is completed in the wastewater treatment facility area (center on the left).